In the background is the new unloader and steaming bay. Now the track matches the floor height of a ute.
Lots if jobs to finish for the upcoming unmeet. Here is the "coffin car" loaded with mulch to rehabilitate the forest from trackworks. In the background is the new unloader and steaming bay. Now the track matches the floor height of a ute. The points at Laura are now prioritized to the mainline, the wye now acting as a passing place.
0 Comments
Leave a Reply. |
Peter NixonThe one man track gang behind the building of the Brisbane Valley Tramway. Archives
September 2015
Categories |