Tracklaying on the final run now well and truly under way. Four out of the five points are in place. Here the passing loop at Chillagoe takes shape. From here on there is no vehicle access once the rails go down. The turntable has come out well, but it's rather heavy. This will test the logging disconnects again! A long walk for the orange shovel to lift it into place on it's concrete block footing. The ballast wagon project worked well. Too well, as I have had to wait till last to keep one for myself! It too will be sold after the track reaches Canungra.
0 Comments
Leave a Reply. |
Peter NixonThe one man track gang behind the building of the Brisbane Valley Tramway. Archives
September 2015
Categories |