(the works inspector has just arrived !)
This is the same view as the bottom picture in the April blog
"Steam Train","Australian Live Steam","QGR","B15","Red Fred","minature train"
Tracklaying continues. Currently there is 460 metres on the ground, and a continuous run of 610metres is possible. (the works inspector has just arrived !) Forsayth Station is in sight! Hopefully the rest of the forest garbage will go at the next workday, then its ready for topcourse and rail. Meanwhile, down in the swamp I've been experimenting with log cordouroy, with considerable success. It's a slow but permanent fix. Here the logs are "off track" temporarily while I negotiate a tree. They were moved back on line before the dirt was laid on top. Finished prep. Some landscaping to do to hide the mess, but the new alignment can now push ahead. This is the same view as the bottom picture in the April blog
0 Comments
Leave a Reply. |
Peter NixonThe one man track gang behind the building of the Brisbane Valley Tramway. Archives
September 2015
Categories |