Compare this pic with October 1st blog, The final approach to Canungra has been roughed in and the little bridge is out of the ground (40 posts in 5 days and lots of aching navvy muscles)
It's been a while since I posted, thanks to some very hot weather, but it's time to take some tentative steps outside (I haven't been slack, the shop is now cluttered with 6 wagon builds and a QR 1500 to sort out) Compare this pic with October 1st blog, The final approach to Canungra has been roughed in and the little bridge is out of the ground (40 posts in 5 days and lots of aching navvy muscles) Looking back to the work site. There's a lot more daylight since new neighbours moved in and dozed a sizable strip of forest along their boundary. Last posts clamped in to temporary formwork and awaiting the mixer to fire up. Not much response for the next unmeet. It will still go ahead, if you are coming and call first or starve!